macrostack

neocloud · vm · Layer 2.5

Scaleway

EU-sovereignty requirements where the supplier being European is the actual requirement.

medium portability Movable with effort. Expect to redo images, storage wiring and networking.

What you are buying

Business model
Purpose-built GPU cloud. Owns or leases its own datacentre capacity and sells it directly.
How you reach it
You get virtual machines. The familiar cloud model.
Accelerators
H100, L40S, L4, plus Ascend and other non-NVIDIA options
Regions
France, Netherlands, Poland
Pricing model
Hourly, published, EU-billed.
Getting started
Credit card.
Capacity
Moderate.
Ownership
Iliad Group (public parent).

Verified 2026-09-09. Fields reading “not published” are exactly that — we do not estimate a figure a vendor withholds.

The counterparty

Backed by a large European telecoms group — materially different from a venture-funded pure-play.

A multi-year GPU commitment is a credit decision wearing a cloud contract. This is the section no benchmark covers and the one that decides what happens to your workload in 2028.

The catch

Smaller GPU catalogue than the specialists, and the console assumes you are a general cloud customer.

The economics

Priced to compete in Europe. Sovereignty is the product; the GPU rate is secondary.

No rate is quoted on this page on purpose. Published list prices at this layer move weekly and essentially nobody signing a real contract pays them. Dated, sourced figures live in the GPU cost calculator, where the cheapest and dearest published on-demand price for the identical H100 sit 5.6× apart.

The layers underneath this one

Whatever you rent here is a chip in a building that needs power. In 2026 megawatts, not silicon, are the binding constraint on the whole industry — a frontier rack draws 120–200 kW against a 2026 average near 27 kW, and the US interconnection queue exceeds 2,600 GW.

Layer 2 — Silicon · Layer 1 — Energy · The interconnection queue · Tokens per watt

Compared against

  • OVHcloud vs Scaleway — European sovereignty from a public host against a telecoms-backed one.Compare with OVHcloud

Related providers

Sources

Macrostack does not benchmark clusters and does not pretend to. For hands-on performance ratings of GPU clouds, SemiAnalysis’s ClusterMAX tests the hardware directly. This page covers what their scorecard does not: who owns the company and how you get out.

The Macrostack brief

New swaps, worth your inbox.

A short, occasional email when we add a high-intent alternative or ship a new head-to-head. No spam, no selling your address — unsubscribe in one click.