H100 training runs where price per hour is the whole decision.

high portability Portable. The workload is standard enough to move to another vendor without a rewrite.

What you are buying

Business model
Purpose-built GPU cloud. Owns or leases its own datacentre capacity and sells it directly.
How you reach it
You get the physical machine. Maximum control, and every layer above it is yours to run.
Accelerators
H100 at scale; the merger announcement counts 36,000+ owned and operated H100, B200 and GB300 GPUs across the combined company.
Regions
US
Pricing model
Hourly and reserved, published, deliberately low.
Getting started
Self-serve.
Capacity
Thousands of H100s, single-part focus.
Ownership
Merged into Lightning AI in January 2026; the combined company is named Lightning AI (the banner on voltagepark.com and the merger announcement, read 17 Nov 2026). Before the merger: private, with a non-profit-affiliated ownership structure.

Verified 2026-09-09. Fields reading “not published” are exactly that — we do not estimate a figure a vendor withholds.

The counterparty

Your counterparty is now Lightning AI. The merger announcement says contracts signed with Voltage Park carry on unchanged; check which company a renewal names.

A multi-year GPU commitment is a credit decision wearing a cloud contract. This is the section no benchmark covers and the one that decides what happens to your workload in 2028.

The catch

It is no longer a separate company. Its own H100 price was still published on our 10 November reading, so check which of the two companies a new order is placed with.

The economics

Among the lowest published H100 rates from a genuine datacentre operator.

No rate is quoted on this page on purpose. Published list prices at this layer move weekly and essentially nobody signing a real contract pays them. Dated, sourced figures live in the GPU cost calculator, where the cheapest and dearest published on-demand price for the identical H100 sit 5.6× apart.

The layers underneath this one

Whatever you rent here is a chip in a building that needs power. In 2026 megawatts, not silicon, are the binding constraint on the whole industry — a frontier rack draws 120–200 kW against a 2026 average near 27 kW, and the US interconnection queue exceeds 2,600 GW.

Layer 2 — Silicon · Layer 1 — Energy · The interconnection queue · Tokens per watt

Read next

  • Lightning AI — the company Voltage Park merged into in January 2026

Compared against

  • Crusoe vs Voltage Park — Two unusual ownership structures, two different reasons the price is low.Compare with Crusoe

Related providers

Sources

Macrostack does not benchmark clusters and does not pretend to. For hands-on performance ratings of GPU clouds, SemiAnalysis’s ClusterMAX tests the hardware directly. This page covers what their scorecard does not: who owns the company and how you get out.