neocloud · bare metal · Layer 2.5
Voltage Park
H100 training runs where price per hour is the whole decision.
high portability Portable. The workload is standard enough to move to another vendor without a rewrite.
What you are buying
- Business model
- Purpose-built GPU cloud. Owns or leases its own datacentre capacity and sells it directly.
- How you reach it
- You get the physical machine. Maximum control, and every layer above it is yours to run.
- Accelerators
- H100 at scale; the merger announcement counts 36,000+ owned and operated H100, B200 and GB300 GPUs across the combined company.
- Regions
- US
- Pricing model
- Hourly and reserved, published, deliberately low.
- Getting started
- Self-serve.
- Capacity
- Thousands of H100s, single-part focus.
- Ownership
- Merged into Lightning AI in January 2026; the combined company is named Lightning AI (the banner on voltagepark.com and the merger announcement, read 17 Nov 2026). Before the merger: private, with a non-profit-affiliated ownership structure.
Verified 2026-09-09. Fields reading “not published” are exactly that — we do not estimate a figure a vendor withholds.
The counterparty
Your counterparty is now Lightning AI. The merger announcement says contracts signed with Voltage Park carry on unchanged; check which company a renewal names.
A multi-year GPU commitment is a credit decision wearing a cloud contract. This is the section no benchmark covers and the one that decides what happens to your workload in 2028.
The catch
It is no longer a separate company. Its own H100 price was still published on our 10 November reading, so check which of the two companies a new order is placed with.
The economics
Among the lowest published H100 rates from a genuine datacentre operator.
No rate is quoted on this page on purpose. Published list prices at this layer move weekly and essentially nobody signing a real contract pays them. Dated, sourced figures live in the GPU cost calculator, where the cheapest and dearest published on-demand price for the identical H100 sit 5.6× apart.
The layers underneath this one
Whatever you rent here is a chip in a building that needs power. In 2026 megawatts, not silicon, are the binding constraint on the whole industry — a frontier rack draws 120–200 kW against a 2026 average near 27 kW, and the US interconnection queue exceeds 2,600 GW.
Layer 2 — Silicon · Layer 1 — Energy · The interconnection queue · Tokens per watt
Read next
- Lightning AI — the company Voltage Park merged into in January 2026
Compared against
- Crusoe vs Voltage Park — Two unusual ownership structures, two different reasons the price is low.Compare with Crusoe
Related providers
- Fluidstack — neocloud, high portability
- OVHcloud — neocloud, high portability
- TensorWave — neocloud, high portability
- Civo — neocloud, high portability
- CoreWeave — neocloud, high portability
- GMI Cloud — neocloud, high portability